Current bearing technology has forced wind turbine designers into horizontal spindle three bladed wind turbines. In the proposed 2GW Magnetic Leviatated wind Turbine the huge blades are connected to a spindle in the center. The bearings that support the spindle and control the pitch of the blades (which can be hundreds of feet long) see huge pitch-moment loading, some of which is manifest as torque energy that is focused through the center spindle. The target speed for the spindle is 18 or 20 rpm and the bearings holding the spindle are mounted in a huge casting which also contains a large gearbox stepping the speed up to 1800 to 2000 RPMs which allows for the proper surface speed relationship between the coils and magnets. It is necessary to invert or condition the current, which is expensive. This gearbox is full of many large bearings, gears and castings; for a 2 MW turbine the gearbox can easily weigh 30 tons. This gearbox needs to be mounted on the top of a pole more than 150 feet in the air and be able to support the turbine blades under full-force wind conditions.
Topics: Onshore Wind ,Vertical Axis Wind Turbines






















Nags
Joshwolf
Robbes
Narsi
Kgurrappa
Farz
Gaya3
Bioreactor
Hadi10
Tskusurkar
Mjantoun
Abinandan
Virafmehta
Greendiamond
Hemamark
Robin
Alchemist
Paragone1
Nsree13
Caseysea
Dipankar123
Zman
Adityachavali
Mickyrox
Mohanalex
Kanishkatks
Cll123
Missjulia
Juhams
Luca1964
Indresh
Sreejithsisupalan
Surendra
Charansathish
Ethannangle
Bhaskarg
Mandersson
Larsyntoo
Larrydhays
0 Responses to Maglev Wind Turbine